Dredger
connected directly to Plant through 1200 metres of 355m I/D pipe
Pumps stones up to 250mm dia
464 tonnes per hour
Dredging process leaves stone clean, thus eliminating washing process
Static lift of 10 metres
to boiling box
Dredge depth of 0-10
metres
Only one Operator
Only five people
altogether on Plant
Producing per annum,
750,000 tonnes of saleable product
Dredger under construction
Testing dredger
Engine room
Dredger connected to plant through 1200m of
pipeline
This page is part of the
Conbar International dredging website. If you see this page in
isolation, i.e. you have been sent here direct by a search engine,
click here